{"id":2744571,"date":"2026-11-27T20:27:02","date_gmt":"2026-11-28T01:27:02","guid":{"rendered":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/southwest-power-pool-ferc-complaint-competitive-bidding-transmission-lines\/"},"modified":"2026-11-27T20:35:13","modified_gmt":"2026-11-28T01:35:13","slug":"southwest-power-pool-ferc-complaint-competitive-bidding-transmission-lines","status":"publish","type":"post","link":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/southwest-power-pool-ferc-complaint-competitive-bidding-transmission-lines\/","title":{"rendered":"Grid Operator Skipped Bidding On $3.8 Billion In Power Lines, Big Electricity Users Say"},"content":{"rendered":"<aside class=\"mashsb-container mashsb-main mashsb-stretched\"><div class=\"mashsb-box\"><div class=\"mashsb-count mash-medium\" style=\"&quot;\"><div class=\"counts mashsbcount\">28<\/div><span class=\"mashsb-sharetext\">SHARES<\/span><\/div><div class=\"mashsb-buttons\"><a class=\"mashicon-facebook mash-medium mash-nomargin mashsb-noshadow\" href=\"https:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Fwww.conservativenewsdaily.net%2Fbreaking-news%2Fsouthwest-power-pool-ferc-complaint-competitive-bidding-transmission-lines%2F\" target=\"_top\" rel=\"nofollow\"><span class=\"icon\"><\/span><span class=\"text\">Facebook<\/span><\/a><a class=\"mashicon-twitter mash-medium mash-nomargin mashsb-noshadow\" href=\"https:\/\/twitter.com\/intent\/tweet?text=&amp;url=https:\/\/www.conservativenewsdaily.net\/breaking-news\/?p=2744571&amp;via=ConservNewsDly\" target=\"_top\" rel=\"nofollow\"><span class=\"icon\"><\/span><span class=\"text\">Twitter<\/span><\/a><a class=\"mashicon-subscribe mash-medium mash-nomargin mashsb-noshadow\" href=\"#\" target=\"_top\" rel=\"nofollow\"><span class=\"icon\"><\/span><span class=\"text\">Subscribe<\/span><\/a><div class=\"onoffswitch2 mash-medium mashsb-noshadow\" style=\"display:none\"><\/div><\/div>\n            <\/div>\n                <div style=\"clear:both\"><\/div><\/aside>\n            <!-- Share buttons by mashshare.net - Version: 4.0.47--><p>Industrial electricity users have asked federal regulators to require competitive bidding on four Southwest Power Pool transmission projects worth nearly $3.8 billion. They allege SPP improperly classified the lines as urgent reliability fixes to award them directly to utilities, even though none is scheduled to operate before May 2029.<\/p>\n<p>SPP says the projects have already been assigned and are underway. It argues the complaint was filed months after its board approved them. Supporters say competition could reduce costs, while New Mexico regulators warn that delays could prolong reliance on diesel and gas generators. SPP\u2019s response to FERC is due December 17. <\/p>\n<div class=\"cnd-readmore\"><button type=\"button\" id=\"readmorebtn\" aria-expanded=\"false\" aria-controls=\"more\">Read more&#8230;<\/button><\/div>\n<div id=\"more\">\n<div>\n<p><time> \t\t\t<span>November 27, 2026<\/span> \t\t\t<span>5:07 PM ET<\/span> \t\t<\/time> \t<\/p>\n<\/div>\n<div id=\"articleContent\" data-article dc_data=\"460666\">\n<p>Industrial power users want federal regulators to force a regional grid operator to let competitors bid on four new power lines.<\/p>\n<p>Southwest Power Pool (SPP) skipped competitive bidding on about $3.8 billion in transmission projects by wrongly labeling them short-term reliability fixes, the Electricity Transmission Competition Coalition and the Industrial Energy Consumers of America <a href=\"https:\/\/elibrary.ferc.gov\/eLibrary\/filelist?accession_number=20261028-5186\">alleged<\/a> in an Oct. 28 complaint to the Federal Energy Regulatory Commission (FERC). SPP\u2019s answer is now due Dec. 17 after FERC pushed back the deadline, according to a Nov. 16 <a href=\"https:\/\/elibrary.ferc.gov\/eLibrary\/filelist?accession_number=20261116-3056\">notice<\/a>.<\/p>\n<p>\u201cBy using the need date that cannot be met to preclude competition, SPP is losing the benefit of competition without a legitimate reason,\u201d the coalition wrote in comments to SPP that the complaint quotes.<\/p>\n<p>\u201cRto\u2019s [regional transmission organizations] do not have any accountability to ratepayers \u2026 and incumbents have too much influence over the RTOs,\u201d Paul Cicio, president and CEO of the Industrial Energy Consumers of America, told the Daily Caller News Foundation in a statement.<\/p>\n<p>The coalition speaks for companies that consume electricity, but its members also include think tanks and \u201cnon-incumbent transmission developers,\u201d according to the complaint.<\/p>\n<p>Transmission rates are \u201cthe fastest growing part of consumer electricity bills,\u201d the complaint states.<\/p>\n<p>SPP\u2019s rules let it hand a project straight to the local utility only if the project is \u201crequired to be in service within three years or less to address an identified reliability violation,\u201d the complaint states. None of the four lines is scheduled to enter service before May 2029, according to the complaint.<\/p>\n<p>One is a 239-mile line running from the Texas Panhandle into southeastern New Mexico. SPP said the line was needed by June 1, 2026, its December 2025 project report <a href=\"https:\/\/www.spp.org\/documents\/75446\/2025%20itp%20short-term%20reliability%20projects%20report.pdf\">shows<\/a>. That line is not scheduled to enter service before Nov. 18, 2030, according to the complaint.<\/p>\n<p>The projects \u201chave already been assigned and the Designated Transmission Owners are in the process of developing and\/or constructing them,\u201d SPP <a href=\"https:\/\/elibrary.ferc.gov\/eLibrary\/filelist?accession_number=20261106-5205\">wrote<\/a> in a Nov. 6 motion to FERC. <a href=\"https:\/\/dailycaller.com\/2026\/03\/27\/data-center-transmission-line-cost-doubles-nextera-energy-west-virginia\/\"><strong>(RELATED: Americans On The Hook After Data Center Transmission Line Cost Suddenly Doubles)<\/strong><\/a><\/p>\n<p>\u201cThere is no evidence Complainants will be harmed without Commission action before February 2027,\u201d SPP wrote in the motion.<\/p>\n<p>FERC closed an investigation into the exemption in 2020 after finding SPP still met its criteria, the grid operator noted in its motion.<\/p>\n<p>The two groups waited nearly nine months after SPP\u2019s board approved the designations to file, the grid operator <a href=\"https:\/\/elibrary.ferc.gov\/eLibrary\/filelist?accession_number=20261112-5283\" rel=\"noopener noreferrer\" target=\"_blank\">argued<\/a> in a Nov. 12 filing.<\/p>\n<p>\u201cSPP is aware of the complaint that has been filed at FERC regarding short-term reliability projects and is currently reviewing it,\u201d the grid operator said in a statement to the DCNF.<\/p>\n<p>It will keep following its tariff rules so the projects are \u201cconstructed in a timely manner to keep the lights on,\u201d SPP said.<\/p>\n<blockquote class=\"twitter-tweet\" data-dnt=\"true\"><p><a href=\"https:\/\/x.com\/SPPorg\/status\/2123133418116423683\"><\/a><\/p><\/blockquote>\n<p>Xcel Energy, which owns Southwestern Public Service Company, did not respond to a request for comment. Oklahoma Gas and Electric (OG&#038;E) did not provide a comment on the record.<\/p>\n<p>The four projects would cost $3.78 billion, SPP\u2019s report shows. About $2.37 billion of that is for a 315-mile line from central Oklahoma to northwest Louisiana.<\/p>\n<p>FERC\u2019s Order No. 1000 took away utilities\u2019 first crack at building lines picked in regional plans, the commission\u2019s <a href=\"https:\/\/www.ferc.gov\/electric-transmission\/order-no-1000-transmission-planning-and-cost-allocation\" rel=\"noopener noreferrer\" target=\"_blank\">summary<\/a> states. It did not make regions take bids.<\/p>\n<p>\u201cEven a 20 percent reduction in the approximately $3.8 billion of proposed investment would represent $760 million in savings,\u201d the Conservative Energy Network, which backs the complaint, <a href=\"https:\/\/elibrary.ferc.gov\/eLibrary\/filelist?accession_number=20261125-5160\" rel=\"noopener noreferrer\" target=\"_blank\">wrote<\/a> on Wednesday.<\/p>\n<p> The group calls itself dedicated to free-market energy policy. It warned that such estimates \u201cshould not be interpreted as guaranteed savings for the projects at issue.\u201d<\/p>\n<p>OG&#038;E offered to give up its return on equity on whatever it spends on the Oklahoma-Louisiana line beyond 20 percent above the estimate in SPP\u2019s notice to construct, according to testimony from Jay Caspary of TransGrid Advisors, a witness for the complainants.<\/p>\n<p>\u201cForegoing return on equity for costs 20% above a figure you get to name, with no outside competitive pressure to offer the lowest dollar amount possible, does not robustly incentivize aggressive cost reductions for customers,\u201d Caspary wrote.<\/p>\n<p>New Mexico\u2019s Public Regulation Commission asked FERC to keep the cost of delay in mind. Drillers in the state\u2019s slice of the Permian Basin still cannot hook their wells up to the local utility, so they run them on diesel and gas generators, the commission <a href=\"https:\/\/elibrary.ferc.gov\/eLibrary\/filelist?accession_number=20261125-5141\" rel=\"noopener noreferrer\" target=\"_blank\">wrote<\/a> on Wednesday.<\/p>\n<p>For the New Mexico line, \u201cspeed to power is imperative,\u201d the commission added. It said it \u201cdoes not take the position that an extended construction schedule negates the reliability need itself\u201d but also cautioned that \u201cpotential delay does not excuse noncompliance.\u201d<\/p>\n<p>The report blames fast load growth and weak ties to the rest of SPP. Southwestern Public Service\u2019s expected load jumped from about 4,700 megawatts to 11,500 megawatts between the 2023 and 2025 planning cycles, nearly 150 percent, it shows.<\/p>\n<p>More than 57,000 outage scenarios in SPP\u2019s models for the area would not solve, which the report says could mean voltage collapse.<\/p>\n<p>SPP later cut the area\u2019s forecast by 11 percent to 20 percent, but the reliability concerns \u201cremain largely unchanged,\u201d the report states.<\/p>\n<p>SPP\u2019s board approved the four designations on Feb. 3. That same day it backed an effort \u201cto maintain and improve the competitive bid framework,\u201d meeting minutes <a href=\"https:\/\/www.spp.org\/documents\/75924\/2026-02-03%20board%20of%20directors%20members%20committee%20meetings%20minutes.pdf\" rel=\"noopener noreferrer\" target=\"_blank\">show<\/a>.<\/p>\n<p>The groups are asking FERC to find that SPP broke its tariff. They also want all four lines put out for bid, according to the complaint.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>November 27, 2026, 5:07 PM ET Industrial power users are urging federal regulators to require the regional grid operator to open bidding on four new power lines. The Electricity Transmission Competition Coalition and the\u2026 say Southwest Power Pool (SPP) improperly bypassed competitive bidding on about $3.8 billion in transmission projects by misclassifying them as short-term reliability fixes<\/p>\n","protected":false},"author":4517,"featured_media":2744572,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_mo_disable_npp":"","fifu_image_url":"https:\/\/cdn01.dailycaller.com\/wp-content\/uploads\/2026\/11\/bonneville-dam-power-lines-columbia-river-getty.jpg","fifu_image_alt":"","footnotes":""},"categories":[548,29362],"tags":[7452,68481,32358,88132],"class_list":["post-2744571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-conservative-news-daily","category-the-daily-caller","tag-electricity","tag-energy-regulation","tag-power-grid","tag-transmission-lines"],"fifu_image_url":"https:\/\/cdn01.dailycaller.com\/wp-content\/uploads\/2026\/11\/bonneville-dam-power-lines-columbia-river-getty.jpg","_links":{"self":[{"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/posts\/2744571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/users\/4517"}],"replies":[{"embeddable":true,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/comments?post=2744571"}],"version-history":[{"count":2,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/posts\/2744571\/revisions"}],"predecessor-version":[{"id":2744574,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/posts\/2744571\/revisions\/2744574"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/media\/2744572"}],"wp:attachment":[{"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/media?parent=2744571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/categories?post=2744571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.conservativenewsdaily.net\/breaking-news\/wp-json\/wp\/v2\/tags?post=2744571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}